Molybdenum from the mine is planned to be recovered through open-pit operations. Shovels, loaders and haul trucks will be used for the mining. Benches will be drilled in an 8m x 8m pattern for recovering the ore. The mine will be equipped with a processing plant consisting of a 40,000t/d concentrator to process the recovered ore.
